Shut down your diesel generator. For good.
Your DG set runs at ₹18–22/unit. TOBOR BESS + solar runs at ₹2–3/unit. For a 60 kW load, that is ₹15–20 lakh saved every year — and under 4 years to payback.
60 kW factory load · 8 h/day · diesel saved
Just on diesel. Before adding maintenance, AMC, and CPCB CEMS instrumentation.
Your 60 kW DG set costs you ₹16.8 lakh every year. Just on fuel.
And that is before you count maintenance, oil changes, the ₹2–4 lakh CPCB CEMS instrumentation now mandatory for any DG above 62.5 kVA, and the reputational cost of fumes and noise.
| Cost line · 60 kW load · 8 h/day | Diesel generator | TOBOR BESS + 80 kWp solar |
|---|---|---|
| Fuel (₹100/L × 17,520 L/year) | ₹17.5 lakh / year | ₹0 |
| Maintenance + oil + AMC | ₹1.2 lakh / year | ₹35,000 / year |
| CPCB CEMS instrumentation (one-time + reporting) | ₹2–4 lakh + audit | — |
| Effective cost per unit (₹/kWh) | ₹18–22 | ₹2–3 |
| 5-year total cost | ₹95 lakh + | ₹10–14 lakh |
Numbers assume diesel at ₹100/L, 8 hours/day operation, and a typical Indian MSME load profile. Your actual savings depend on tariff, daylight hours, and load pattern — use the calculator for a site-specific number.
Every DG above 62.5 kVA needs Continuous Emission Monitoring.
Add ₹2–4 lakh for instrumentation, plus ongoing third-party reporting and audits. Or skip the requirement entirely by replacing the DG with a BESS. State boards (HSPCB, MPCB, GPCB, TNPCB) are inspecting now.
CEMS hardware + integration per DG
Third-party reporting + audits
If non-compliant during inspection
Compliance burden eliminated
Which TOBOR model replaces which DG?
Map your DG kVA to a TOBOR BESS — from a 30 kW MTX cabinet to a 10 MW CTX block. Most factories keep a smaller standby DG for multi-hour outages; the BESS handles 95% of everyday load.
Replaces · 62.5 kVA
MTX-S60
MSME plant, 3-star hotel, mid-size hospital wing · MTX-H60 if you add solar
See MTX-S60 specs →Replaces · 250–320 kVA
PTX-250
Large MSME, IT park floor, data centre row · 257 kWh
See PTX-250 specs →Replaces · 500–625 kVA
PTX-500
Steel, textile and pharma plants, campus microgrid · 514 kWh
See PTX-500 specs →Replaces · 2,500 kVA
PTX-2000
Multi-DG plant room, large industrial estate · 2.06 MWh
See PTX-2000 specs →Replaces · 3 MVA and above
CTX-5000
DG farms, solar parks, utility sites · 2.5 MW / 5.06 MWh per 20 ft container, up to the 10 MW CTX-B20 block
See CTX-5000 specs →Operator questions, answered.
How fast does it switch over when the grid drops?
What is the running cost of DG vs BESS in 2026?
Does BESS solve the CPCB CEMS compliance burden?
How long is the payback for a commercial BESS?
Can we keep the DG as standby and use the battery primarily?
Stop burning diesel. Start burning numbers.
In-house BMS, EMS & PCS · Made in Gurugram