Maharashtra net metering ended at 10 kW. Storage is the answer.
MSEDCL capped net metering at 10 kW for LT consumers. Pune, Nashik, and Aurangabad MSME density runs hot on demand charges. Vidarbha sees 6–8 h power cuts every summer. Infozeb BESS solves all three.
Maharashtra · quick facts
DISCOM
MSEDCL · BEST · Tata Power
Residential peak
₹11.5/unit
Commercial rate
₹9.8/unit
Net metering
Capped at 10 kW for LT consumers. Above that, BESS is mandatory to capture solar.
Payback band
3.5–4.5 yr (commercial) · 4–5 yr (residential)
Above 10 kW solar? You can't net-meter the extra. Store it instead.
MSME density in Pune and Nashik drives commercial demand. Mumbai suburb residential pays ₹11+/unit at peak. Vidarbha grid is unreliable through the summer.
Infozeb sites in Maharashtra.
A few representative deployments. Full case studies — including metrics — live in our case-study library.
Pune
Auto-component factory
240 kW system · live and reporting to portal.infozeb.energy
Aundh
Multi-tenant villa block
9 kW × 18 system · live and reporting to portal.infozeb.energy
Nashik
Pharma manufacturing
480 kW system · live and reporting to portal.infozeb.energy
Local questions, answered.
What does MSEDCL allow above 10 kW solar now?
Are there state subsidies on top of MNRE / PM Surya Ghar?
Does Vidarbha's summer load shedding affect BESS sizing?
More answers → the full FAQ
Ready to size a system for your Maharashtra site?
220+ sites running across India · 14 MWh deployed · Made in Gurugram