Replaced an ageing flooded-lead-acid UPS plus oversized DG set with a 240 kW BESS islanded in <20 ms. Critical care, imaging, server room and OT now ride through grid sags without DG starts.
Detailed write-up coming soon. In the meantime, talk to us about a similar deployment.
Share your load profile — we'll send a sizing proposal within one working day.
Talk to us